AttachmentSize Strategic Noise Maps of the above-ground sections of Lines 1 and 2 of the Bilbao Metropolitan Railway (phase IV). Year 20226.17 MB Action Plan against noise and vibration on Bilbao metro lines: 2021-20249.73 MB Strategic noise maps for Lines 1 and 2 of BMR for the 2018 scenario.17.18 MB Technical report on Strategic Noise Map of Metro Bilbao lines. 2016 scenario3.06 MB Technical report on strategic noise map of Metro Bilbao lines. 2012 scenario.3.41 MB Action plan against noise and vibration on Bilbao Metro lines: 2017-2021693.6 KB Anuncio relativo a la aprobación definitiva del Plan de Acción contra el ruido y las vibraciones 2017-2021, 07/03/20171.16 MB Description of the procedure applied to delimit the noise easement area for the lines of the FMB2.13 MB