CTB is to earmark €2.5 million in funding for a new control centre at Metro Bilbao which will be used in case of serious incidents.

This back-up control centre will be installed at the Ariz depot in Basauri, which will take over control of the operation of all systems on the network should a serious incident knock out the current control centre at Calle Navarra 2.

This back-up control centre will be installed at the Ariz depot in Basauri, which will take over control of the operation of all systems on the network should a serious incident knock out the current control centre at Calle Navarra 2.

Work is already ongoing to adapt the Metro’s interlock systems, to the tune of a further €400,000, to ready them for use with the new back-up control centre.

The current control centre is also to be fitted with additional traffic management functions to upgrade its internal operation.

2017-07-20