CTB awards contracts for investment in excess of €8 million in Metro Bilbao

The main projects include the tender for the back-up control centre at the centralised control centre, for the amount of €2.4 million. The facilities at the Ariz depot in Basauri will house this new centre, which will take over operation of all Metro systems should a serious incident knock out the current control centre at Calle Navarra 2

The main projects include the tender for the back-up control centre at the centralised control centre, for the amount of €2.4 million. The facilities at the Ariz depot in Basauri will house this new centre, which will take over operation of all Metro systems should a serious incident knock out the current control centre at Calle Navarra 2

2017-10-31